CAREER OBJECTIVE: |
To continuously and economically enhance
downstream petroleum installations. |
|
|
SUMMARY OF PROFESSIONAL STRENGTHS |
An innovative, conscientious professional
with 29 years of experience in project management, construction and surveying.
Proven track record in major oil marketing project management and consulting
with the following demonstrated competencies: |
|
* Coordinating materials, costs and schedules. |
|
* Utilizing creativity and ingenuity
to trouble-shoot and solve problems. |
|
* Providing leadership to produce practical
and accurate work. |
|
* Incorporating the owner's objectives
with code requirements into a practical design. |
|
|
WORK HISTORY |
|
Oct. 1992 - Present |
COLD CREEK ENTERPRISES LTD. |
|
Chief Engineer/President |
|
To foster a corporate strategy of managing
a consulting business specializing in design, project management and inspection
of petroleum marketing facilities based on good engineering practice guided
by the current codes. Services include plan preparation of existing facilities,
design and layout of new facilities. Tailored to client's needs and requirements,
complete tender/permit packages with project management to minor consultation
to solve a specific problem. |
|
|
|
Special Accomplishments: |
|
* Developed standard drawings and specifications
for UFA’s marketing facilities. |
|
* Developed a used oil handling system
with “fail-safe” over fill prevention. |
|
* Measured and prepared as-built drawings
for many existing locations to allow the planning and construction of upgraded
or new facilities. |
|
|
|
Recent Projects: |
|
* Assisted with the installation of four
Laser 4000 car washes and accepted design responsibility for three dispensing
system upgrades for Husky in Calgary. |
|
* Designed, scheduled, inspected and
as-built drawings for two bottom loading skids for the Shell Distribution
Terminal in Calgary. |
|
* Designed an aircraft refueling storage
facility for Executive Flight Centres in Nisku. |
|
|
Jan. 1992 - Oct. 1992 |
Renovation projects on personal property
and volunteer on the addition of two classrooms at the First Lutheran Church. |
|
|
Sep. 1990 - Dec. 1991 |
Project Engineer, ESSO Resources
Canada Limited |
|
Responsibilities: |
|
Development and project management of
production facilities - new construction and upgrades. |
|
Special Accomplishments: |
|
* Completed the first high-pressure fibreglass
water flood pipeline in the Drayton Valley area. |
|
* Developed a "Mega Steam" proposal for
Cold Lake 'Tar Sands' Phase 7-8. |
|
|
Jul. 1989 - Sep. 1990 |
Construction Manager, ESSO Petroleum
Canada |
|
Responsibilities: |
|
* Co-ordination of the TEXACO to ESSO
Re-brand for the area spanning from |
|
Western Ontario to Central British Columbia
including: material delivery and quality assurance supervision; stewardship
of cost control and schedule permit coordination with 3 marketing divisions. |
|
* Supervision of 12 Team members. |
|
ESSO image compliance. |
|
Special Accomplishments: |
|
* Wrote electrical a scope of work for
national program. |
|
* Completed the project 25% under budget
4 months ahead of schedule. |
|
* Increased the Western supplier base
(sign manufacturers) |
|
|
Jul. 1987 - Sep. 1990 |
Senior Construction Engineer,
TEXACO Canada Inc. |
|
Responsibilities: |
|
* Co-ordination of capital investment
for the Texaco Marketing Department in Saskatchewan, Alberta and British
Columbia. |
|
* Supervision of 8 Engineering Services
team members. |
|
* Support maintenance activities. |
|
* Maintain as-built/standard drawings
and project files. |
|
Special Accomplishments: |
|
* Team leader for the development of
a new community style gas bar/ carwash/food mart, which North Vancouver
adopted as their standard. |
Apr. 1974 - July 1987 |
Construction Engineer, TEXACO
Canada Inc. |
|
Responsibilities: |
|
Turn key project management of all capital
projects in an assigned area including: |
|
* Conceptualize proposal plans and estimate. |
|
* Design, material acquisition and tendering. |
|
* Cost, schedule and quality assurance
to commissioned acceptance and as-built project records. |
|
Special Accomplishments: |
|
* 1986 System 2000 standard drawing upgrade. |
|
* 1984 Calgary marketing terminal automation
and expansion. |
|
* 1983 Computerized tankage replacement
estimate program in basic. |
|
* Acting Chief Engineer, June 1980 -
Nov. 1981. |
|
* Pilot project co-ordination i.e. Canopy,
Kiosk, Quick Lube, Self Serve. |
|
* Developed and maintained a project
estimating system. |
|
|
1972 - 1974 |
Project Officer, Government of
Canada, DPW |
1970 - 1972 |
Chief Party, Clark, Swanby and
Associates Surveys |
EDUCATION |
B.Sc. (Electrical Engineering), University
of Alberta 1970 |
CAREER DEVELOPMENT |
Participates in the Continuing Competency
Program with APPEGA as a practicing Professional Engineer. Review and input
to PTMAA on Part IV of AFC. |
INTERESTS |
Still, Digital and Video Photography,
Woodworking, Fishing, Skiing |
ASSOCIATIONS |
Member: APPEGA,
APEGBC.
Licences Available in all other Canadian Jurisdictions |
|
|